VN Softverg
VN Softverg Technology
BOOTING SYSTEM0%
How we work

A delivery process you can actually see

From the first workshop to years of support, every engagement follows the same disciplined, transparent methodology — adapted to your team, your tools and your pace.
01Discovery02Design03Build04Test05Launch06Support & evolve
End-to-end lifecycle

Six phases. Zero surprises.

Each phase has clear activities, owners and outputs. You always know where we are, what comes next and what we need from you.
  1. Phase 011–3 weeks

    Discovery

    We learn your business before we touch your code.

    • Stakeholder interviews and goal-setting workshops
    • Technical audit of existing systems, data and integrations
    • User journeys, risks, constraints and success metrics
    • Prioritized backlog with estimates and a release plan
    OutputScope document, architecture outline, estimate & roadmap
  2. Phase 022–4 weeks

    Design

    Shape the experience and the architecture together.

    • Wireframes, clickable prototypes and design system in Figma
    • Usability checks with real users where possible
    • Solution architecture, data model and API contracts
    • Security, scalability and cost considerations up front
    OutputApproved UI designs, architecture decision records, API specs
  3. Phase 03Iterative sprints

    Build

    Working software every two weeks, not a big reveal at the end.

    • Two-week sprints with planning, daily stand-ups and demos
    • CI/CD pipelines and environments set up in sprint one
    • Trunk-based or GitFlow branching with mandatory code review
    • Infrastructure as code for repeatable cloud environments
    OutputDemo-able increments, release notes, living documentation
  4. Phase 04Continuous

    Test

    Quality is everyone's job, every sprint.

    • Unit, integration and end-to-end automated tests in CI
    • Manual exploratory testing on real devices and browsers
    • Performance, accessibility and security scanning
    • User acceptance testing support with clear sign-off criteria
    OutputTest reports, defect log, UAT sign-off
  5. Phase 051–2 weeks

    Launch

    Calm, rehearsed go-lives with a rollback plan.

    • Go-live checklist, runbook and rollback strategy
    • Data migration dry runs and cut-over rehearsal
    • Monitoring, alerting and logging wired before launch
    • Hyper-care period with the build team on standby
    OutputProduction release, runbooks, monitoring dashboards
  6. Phase 06Ongoing

    Support & evolve

    Keep it healthy, secure and improving.

    • SLA-based support with defined severity levels
    • Patching, dependency upgrades and security fixes
    • Usage analytics feeding the next improvement backlog
    • Knowledge transfer if you choose to take it in-house
    OutputMonthly service reports, improvement roadmap
Agile ceremonies

Scrum rhythms, without the theater

We run lightweight Scrum by default and switch to Kanban for support and operations work. Every ceremony exists to produce a decision or working software.
Every 2 weeks

Sprint planning

Agree the sprint goal and commit to a realistic set of backlog items.

Daily · 15 min

Daily stand-up

Progress, plan and blockers. Your team is always welcome to join.

Every 2 weeks

Sprint review / demo

We show working software, not slides, and capture feedback live.

Every 2 weeks

Retrospective

What worked, what did not, and one concrete improvement for next sprint.

Weekly

Backlog refinement

Clarify, split and estimate upcoming stories with your product owner.

Communication cadence

You will never wonder what is happening

Distributed teams fail on communication, not code. So we make it predictable: the same channels, the same reports, on the same days — with a named lead accountable for all of it.
Daily

Real-time chat

A shared Slack or Microsoft Teams channel with the whole pod — no ticket black holes.

Weekly

Written status report

Progress against plan, risks, decisions needed, budget burn and next week's focus.

Monthly

Steering review

Leadership-level review of outcomes, roadmap, commercial health and team feedback.

Every working day

Overlap hours

Guaranteed overlap with your time zone for calls, reviews and quick decisions.

Tooling

Your tools or ours — either works

We plug into your existing stack with your accounts and permissions, so the history, code and documents always stay with you.
J
Jira
Backlog, sprints & roadmaps
S
Slack / Teams
Day-to-day collaboration
G
GitHub / GitLab
Code, reviews & CI/CD
F
Figma
Design, prototypes & handoff
C
Confluence / Notion
Docs & decision records
M
Grafana / CloudWatch
Monitoring & alerting
Quality gates

Nothing ships until it passes

Six checkpoints between an idea and production. They are automated wherever possible, so quality does not depend on anyone remembering.
Gate 1

Definition of ready

Stories have acceptance criteria, designs and dependencies before they enter a sprint.

Gate 2

Pull request review

At least one reviewer, linting, type checks and tests passing before merge.

Gate 3

Automated test suite

Agreed coverage thresholds; failing tests block the pipeline.

Gate 4

Security scan

Dependency, secret and static analysis scans on every build.

Gate 5

Definition of done

Deployed to staging, tested, documented and accepted by the product owner.

Gate 6

Release readiness

Runbook reviewed, rollback tested, monitoring in place, stakeholders signed off.

Start a project

Ready to see the process in action?

Tell us about your project, team gap or IT challenge. A senior consultant replies within one business day with next steps — no obligation.